This option will reset the home page of this site. Restoring any closed widgets or categories.

Reset

Second order for Dong Fang; first collaboration with Moventas

The Switch has signed a new agreement with Dong Fang for a 3 MW drive train to be designed in collaboration with Finland-based Moventas, who will deliver the gear solution for the turbine. The aim is to optimize the entire package for Dong Fang to sell to the Chinese market. The new order comes right after the successful startup of The Switch 1.5 MW direct-driven generators.

We only aggregate – Get The Whole Story Here

Related Posts

  1. Collaboration Energizes Renewable Energy
  2. Dong Energy: ‘Clean’ Denmark’s dirty secret
  3. Siemens Gets 80-MW Order from RES, 100 MW from EWE
  4. AMSC Gets US $20M Turbine Control Order
  5. Vestas Receives 140-MW Turbine Order for Bulgaria & Romania

Comments are closed.